MRP pegging enquiry (REQ202C)

On this panel you can view references to MRP proposals.

Options

Pegging Select this option to view items on a higher level. This option is only valid for Dependent demands.

Function keys

Previous item Return to the previous item for which the Pegging option was used on a Dependent demand.
Item
Warehouse
Unit
Lead time
For produced items, the normal time in working days from order to delivery. For purchased items, the planning time.
Planner
The planner that is connected to the item.
EOQ
The economic order quantity.
Cost price
The result of a product cost run.

Safety stock
The item’s safety stock quantity. If safety stock time is used for the item, time is recalculated into quantity.
On hand + usab
The actual quantity on hand and usable quantity in the non-conforming stock at creation time for the proposal.
Req date
The requirement date.
Type/Reference
The reservations and orders that have created proposals.
Start date
The start date. For produced items the start date is calculated depending on the selection, either with help from the given lead time for the item or by using bill of routing to calculate the total operation time. For purchased items the start date is calculated based on the item’s planning time.
Quantity
The proposal quantity or quantity for the reference.
Theoretical qty on hand
The disposable quantity on hand in the warehouse if proposals are released.
A C
The code indicates the type of re-scheduling action that was proposed by the system.

Valid codes are:

Code Description
1 Backward scheduling
2 Forward scheduling
3 Delete
R A
The code indicates that the manufacturing order has been accepted without any changes, and why the order has not been re-scheduled.

Valid codes are:

Code Description
1 Manually
The re-schedule proposal has been manually ignored using the Omit re-schedule option on the MRP re-schedule proposal maintenance panel.
2 Automatically
The need for a re-schedule proposal has been automatically ignored since Re-schedule indication days have been defined on the Material requirements planning (MRP) panel.
Order changed
Indicates if the order date or quantity have been changed after the creation of proposals. For sales order lines the dispatch date is checked. For manufacturing orders the completion date is checked. If the order is deleted this is also indicated.